Design Conversion Approach

Design Conversion Approach

Multiple Processes

Unlike Parallel Jobs, input or output (passive) stages can be deployed in designs which enable a single stage to act as both an input and output in a Server job. When a job contains such a design, the Server engine will synchronize execution of the stage, so that any load processes are completed before performing the read processes.

For example, consider the following job design:

The processes used by the server job will be synchronized such to ensure that the stages in Group 1 (above) are fully executed before starting the stages in Group 2. To convert this job design to run on the PX engine we’ll need to create a Parallel job representing each of the job’s synchronised sub-groups (1 and 2) and a coordinating sequence to mimic the synchronization provided by the Server Engine:

A similar challenge exists for shared containers that include stages that act as both a source and target. The same principles apply here but need to split the shared containers:

Jobs that use DSJobName and DSJobController macros will no longer produce the same output after applying this transformation. Any easy solution would be to have the sequence capture these values and pass them to the child jobs as parameters. Any existing use of DSJobName and DSJobController would then be updated to use the parameters.

 

Related content

Converting jobs with Job Control
Converting jobs with Job Control
More like this
Differences between Server and Parallel VarChar
Differences between Server and Parallel VarChar
Read with this
Parallel Job Naming
Parallel Job Naming
More like this
Server to Parallel Architecture and Workflow
Server to Parallel Architecture and Workflow
Read with this
Introducing Parallel Job Structural Differences
Introducing Parallel Job Structural Differences
More like this
The S2PX configuration file
The S2PX configuration file
Read with this

© 2015-2024 Data Migrators Pty Ltd.